Skip to content

Back to projects

Fountaindale Groundwater Supply System Operational Testing

Location

Frederick County, MD

About

GTA evaluated existing groundwater supply well field drawdown, pumpage and test data, and prepared a work plan for well field testing. Performed operational 90-day well field testing to evaluate system performance and as a basis for providing recommendations on optimization of groundwater withdraws. The test consisted of simultaneously pumping eight wells during a 90-day test period, observing groundwater level responses and logging flow rates.  GTA analyzed well performance, potential well interference and pumping/drawdown data in the context of system constraints. GTA provided an estimate of sustainable well field  yield, and provided recommendations on optimization of well performance.

 

Explore some of our similar projects here:

Soil-Cement Stabilization for CNX Well Pads

Various Locations – Pittsburgh, PA

Beech Creek

Harford County, MD

Partner With Us

With more than 500 engineers, geologists, scientists, technicians, and support personnel, GTA has the expertise, resources, and experience to meet your needs. Reach out to us today.